On behalf of Total, CNSTRCT has realized the head office of Total Netherlands.
In this authentic building on the Bezuidenhoutseweg, we have been able to realize the property turnkey to ensure that it meets Total’s wishes.
Among other things, the design consists of custom-made furniture, the complete interior design, the finishing of the walls and floors and the installation of acoustic panels.
The result is a magnificent high-quality finish that does justice to the history of this beautiful building.